Author = Fattahi, Parviz
Production and Equipment Detection Scheduling with Environmental Degradation Costs Caused by System Deteriorations

Volume 8, Issue 16, September 2020, Pages 1-13

10.22084/ier.2020.19256.1855

Parviz Fattahi; Saeideh Asadzadeh; Sanaz Sheikhtajain; Samaneh Babaeimorad


A model for job shop scheduling with a parallel assembly stage to minimize makespan

Volume 2, Issue 4, March 2015, Pages 39-53

Fatemeh Daneshamooz; Mona Jabbari; Parviz Fattahi


The Study of inflation and time value of money effect in batch size production with reworking consideration

Volume 1, Issue 2, December 2013, Pages 109-121

Bahman Esmaeilnezhad; Salman Aghababaei; Parviz Fattahi; Vahid Khodakarami; Hoda moradipour